More body prep...

More body prep...

14/02/10 | by admin [mail] | Categories: General

Got a wee bit more done this weekend… the quarter joins are very time consuming because my “bogging” is not great, so takes me a few more layers and more sanding than it would with someone who knows what they are doing.
Also repaired the front drip rail on the drivers side which was rusted through. Some seam sealer inside it should finish it off, and possibly a little filler underneath.

Cleaned up the trunk and started to prime it, but ran out of pressure pack etch primer, so might have to fire up the compressor and finish it off with the gun. I plan to paint the whole lot with the black POR-15 paint that I used for the floors.
Also sat the right front quarter back in place after spraying body deadner inside it.

Comments, Pingbacks:

No Comments/Pingbacks for this post yet...

Leave a comment:

Your email address will not be displayed on this site.
Your URL will be displayed.

Allowed XHTML tags: <p, ul, ol, li, dl, dt, dd, address, blockquote, ins, del, span, bdo, br, em, strong, dfn, code, samp, kdb, var, cite, abbr, acronym, q, sub, sup, tt, i, b, big, small>
(Line breaks become <br />)
(Set cookies for name, email and url)
(Allow users to contact you through a message form (your email will NOT be displayed.))
This is a captcha-picture. It is used to prevent mass-access by robots.
Please enter the characters from the image above. (case insensitive)

Jeff's 1966 Mustang Coupe Project

Project diary for hybrid's 1966 Mustang Project

September 2010
Mon Tue Wed Thu Fri Sat Sun
 << <   > >>
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30      

Categories

Linkblog

Misc

XML Feeds

What is RSS?

powered by b2evolution free blog software