Got a wee bit more done this weekend… the quarter joins are very time consuming because my “bogging” is not great, so takes me a few more layers and more sanding than it would with someone who knows what they are doing.
Also repaired the front drip rail on the drivers side which was rusted through. Some seam sealer inside it should finish it off, and possibly a little filler underneath.
Cleaned up the trunk and started to prime it, but ran out of pressure pack etch primer, so might have to fire up the compressor and finish it off with the gun. I plan to paint the whole lot with the black POR-15 paint that I used for the floors.
Also sat the right front quarter back in place after spraying body deadner inside it.
No Comments/Pingbacks for this post yet...
Project diary for hybrid's 1966 Mustang Project
| Mon | Tue | Wed | Thu | Fri | Sat | Sun |
|---|---|---|---|---|---|---|
| << < | > >> | |||||
| 1 | 2 | 3 | 4 | 5 | ||
| 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 | 23 | 24 | 25 | 26 |
| 27 | 28 | 29 | 30 | |||